New bulkhead steps

We demolished a set of bulkhead steps to a basement we’re in the process of remodeling. We dug the concrete steps out and the soil underneath (which happened to be clay). We dug several feet below the future landing and set a grate in the center of the landing with a catch basin that we’ve poked several holes into – this will allow the customer to open the grate and clean out any debris that gets into the basic so it doesn’t clot this ‘mini’ drywell we’ve installed. We poured the landing and walls last week and formed and poured the steps today. Tomorrow we’ll remove the forms and stucco/parge the walls and steps for a finished look.


Comments are closed.