Thin brick veneer progress in West Roxbury

Today Eric made quite a bit of progress veneering the foundation walls in West Roxbury.  The bottom two courses took the longest time as he worked to make sure they were perfectly level.  He’s moving along well, installing 1/2″ spacers at each brick.  Below is a picture at around noontime.  This guy is a perfectionist!!!  Marvin and Alex worked at the rear of the house installing the second story posts and framing the area below the first floor deck as that will be veneered as well.  Alfredo finished scratch coating the rest of the foundation.

Thin brick veneer being installed in West Roxbury

Thin brick veneer from Marion Ceramics installed over concrete foundation in West Roxbury, MA